
| Contract: | Improvement of Traffic Flow on National Road DN1 between Băneasa Airport (km 8+100) and Otopeni Airport (km 17+100) |
| Client: | Romanian National Company of Motorways and National Roads |
| Date: | 2003-2005 |
| Description: | Elaboration of the Detailed Design for the improvement of the traffic flow on the national road DN1 between Baneasa Airport (km 8+100) and Otopeni Airport (km 17+100). The Project has a total length of 9 Km and includes the following three contracts:
|
Design & Consultancy references (click on each reference for further information):